The field was discovered in 1986 by Chevron Nigeria Limited. Mahin Field is located in shallow waters (13-15 meter Water depth) offshore Western Niger Delta.
Mahin-1 was drilled to a total depth of 9,540.6ft in 1968, and Mahin-2 was drilled in 1986 to test the other fault compartments in the field. Mahin-2 Well encountered ten (9) hydrocarbon-bearing sands –4055/MH_2, 4104/MH_2, 4153/MH_2, 4252/MH_2, 4299/MH_2, 4429/MH_2, 4533/MH_2, 5167/MH_2 and 5622/MH_2 sands respectively. RFT was carried out at various depths, yielding varying results, and subsequently suspended. No DSTs were conducted on the well.
Based current preliminary asset evaluation. There is an indication that the proven reserves estimate on the Mahin Field is 23mmbo, with a significant upside potential.
The stated reserves are for MAHIN-2 structure. Additionally, upside is represented by undrilled prospects and MAHIN-1 structure, currently under evaluation.